MUNICIPAL WATER TREATMENT, STORAGE & DISTRIBUTION SYSTEM
DRAWING SET & JURISDICTION
SHEET SET: M-2026-WTR
SERVICE AREA: NORTH REGIONAL BASIN (POP. 248,000)
SYSTEM STATUS / DATE
OPERATIONAL / NORMAL
2026-08-14 • REV. 04
A-01

REGIONAL WATER INFRASTRUCTURE / SCHEMATIC OVERVIEW

DWG REF: NLW-SCH-01
RIVER INTAKE 28.0 MGD CAP TREATMENT PLANT SEDIMENT • FILTER • CL2 18.4 MGD ACTIVE PUMP A RESERVOIR 01 4.2 MG (88%) RESERVOIR 02 3.8 MG (92%) EAST ZONE 64 PSI • NORMAL WEST ZONE 58 PSI • NORMAL 1 2 3 4 5
[01] RAW INTAKE
NORTH SULLIVAN RIVER
Triple bar screen with automatic traveling debris rake and submerged ultrasonic flow sensors.
[02] PRIMARY TREATMENT
NORTHLINE FACILITY
Coagulation, flocculation, dual-media anthracite filtration, and UV/chlorine contact chambers.
[03] ELEVATED STORAGE
RESERVOIRS 01 & 02
8.0 MG combined enclosed storage providing 36h emergency civic reserve and hydraulic head.
[04] PRESSURE BOOST
PUMP STATIONS A/B
Variable frequency drive vertical turbine pumps maintaining grid pressure across elevation gradients.
[05] DISTRIBUTION
EAST / WEST GRIDS
480 miles of ductile iron distribution mains serving residential, commercial, and fire suppression loops.
A-02

CURRENT SYSTEM CONDITIONS / DIMENSIONS & SCHEDULED VALUES

LIVE TELEMETRY CADENCE: 60 SEC
DAILY TREATMENT FLOW
18.4MGD
DESIGN CAP: 24.0 MGD 76.6% OF CAP
COMBINED RESERVOIR STORAGE
7.24MG
MAX CAPACITY: 8.0 MG 90.5% FULL
AVERAGE GRID PRESSURE
61.2PSI
RANGE: 50–80 PSI NOMINAL
ACTIVE BOOSTER PUMP FLEET
7 / 8UNITS
1 UNIT ON STANDBY PM STANDBY
B-01

FIG. 04 / NORTHLINE TREATMENT PLANT PROCESS CROSS-SECTION

CROSS-SECTION SCHEMATIC
INTAKE / MIX A SEDIMENTATION B FILTRATION C DISINFECTION D CLEARWELL HIGH-SERVICE PUMPS E
PROCESS ANNOTATION RAIL
[A] RAPID MIX: Coagulant dosing (alum + polymer) destabilizes colloidal particulates in 45s flash mix.
[B] CLARIFICATION: Lamella plate settlers reduce suspended solids by 94% before downstream filters.
[C] DUAL MEDIA: 24-inch anthracite over 12-inch silica sand achieves effluent turbidity <0.05 NTU.
[D] CONTACT BASIN: Sodium hypochlorite contact time CT > 30 mg•min/L provides 4-log virus inactivation.
[E] CLEARWELL: 2.5 MG underground finished water clearwell feeds three 400-HP vertical turbine pumps.
B-02

INFRASTRUCTURE ASSET SCHEDULE / ACTIVE FACILITIES

INVENTORY REV: 2026-Q3
MARK FACILITY / LOCATION TYPE / FUNCTION DESIGN CAPACITY OPERATIONAL STATE LAST INSPECTION
PS-A01 North Booster Station • Mile 4.2 Northline Rd Distribution Booster 8.4 MGD (3 Pumps) ACTIVE AUG 04, 2026
RS-01 Ridge Elevated Reservoir • Hilltop Crest Treated Storage 4.2 MG Enclosed NORMAL (88%) AUG 08, 2026
PS-B02 Creek Pumping Station • East Valley Branch Pressure Boost Loop 5.8 MGD (2 Pumps) MAINTENANCE AUG 11, 2026
RS-02 South Basin Tank • Industrial Corridor Equalization Storage 3.8 MG Enclosed NORMAL (92%) AUG 02, 2026
TP-01 Northline Main Water Treatment Facility Primary Clarification/Filtration 24.0 MGD Rated ACTIVE AUG 14, 2026
C-01

CAPITAL IMPROVEMENT PROGRAM / ACTIVE INFRASTRUCTURE PROJECTS

CIP FISCAL 2026-2027
PROJECT C-14 CONSTRUCTION
WEST MAIN TRANSMISSION LINE REPLACEMENT
Replacing 4.8 miles of 36-inch cast iron main with resilient C905 fusible PVC to reinforce redundant supply to West District.
TOTAL LENGTH: 4.8 MILES 62% COMPLETED
0.0 MI 2.4 MI 4.8 MI
PROJECT C-18 PHASE 2 TESTING
NORTHLINE OZONE DISINFECTION UPGRADE
Installation of advanced ozone generation contactors to neutralize seasonal taste/odor compounds and emerging micro-pollutants.
CAPACITY: 24.0 MGD 88% COMPLETED
0% 50% 100%
PROJECT C-22 PROCUREMENT
SMART ACOUSTIC LEAK DETECTION GRID
Deployment of 320 permanent correlating hydrophone loggers on critical distribution valves to achieve real-time loss mitigation.
SENSORS: 320 UNITS 25% COMPLETED
0 UNITS 160 320 UNITS
C-02

PUBLIC INFORMATION & RESIDENTIAL REFERENCE

CIVIC ADVISORY SECTION

Where Your Water Comes From

Northline Waterworks draws untreated source water from the protected upper reaches of the Sullivan River Watershed. This regional basin is fed by mountain snowmelt and monitored continuous riparian buffers to preserve baseline purity before entering municipal intake channels.

Understanding Water Treatment

Water undergoes a multi-barrier purification process combining rapid coagulation, gravity sedimentation, dual-media anthracite filtration, and multi-point disinfection. Every drop meets or exceeds all National Primary Drinking Water Standards before leaving our clearwell reservoirs.

What To Do During Grid Maintenance

Scheduled maintenance on local booster stations or transmission pipes may occasionally cause minor temporary fluctuations in pressure or harmless mineral discoloration. If you notice sediment after work in your area, simply run your cold water tap for 2–3 minutes until clear.

How Infrastructure Projects Are Prioritized

Capital projects are prioritized through rigorous asset management criteria including pipe age, historical break frequency, hydraulic demand growth, and water quality telemetry. Our 10-year capital improvement program balances long-term reliability with responsible public rate management.